Skip to main content

Projects in Assess & Evaluate Phase

The City of Columbia uses various methods of inspection during the Assess & Evaluate Phase to determine which areas are most in need of upgrade and improvement.

Projects in Prioritize & Select Phase

The City prioritizes projects based on completed assessments and selects engineering consultants and/or contractors needed to complete the project during the Prioritize & Select Phase.

Projects Under Design

The engineer prepares detailed plans and easement plats for the project and applies for permits during the Design & Permit Phase.

Projects Under Construction

The contractor completes the physical construction of the project during the Construct Phase.

Project NameProject #
862 Stebondale Rd Stream StabilizationSS765301
Annual Gravity Sewer MH Lining & ReplacementSS678625
Annual Gravity Sewer MH Lining & ReplacementSS678626
Annual Rehab on Lines < 15"SS696626
Ansel Street Sewer ReplacementSS751801
Beltline Columbia Storage CanopySS752801
Bluff Road Improvements Windy to CarswellSS745601
Broad River Pump Station Miscellaneous ImprovementsSS761501
Candi Lane 30" SewerSS765001
Carolina Crossroads RelocationSS746001
Columbia Metro Hydronics BoilerSS766701
Congaree PointeSS766101
Crane Creek 01 Sewer System Evaluation Study and Sewer Rehabilitation ImplementationSS746301
Crane Creek 02 and 04 SSESSS746401
Crane Creek Lower North Branch CapacitySS735003
Crane Creek Upper N Branch Ext & Lower N Branch Cap UpgradeSS735001
Crane Creek Upper North Branch ExtensionSS735002
CSAR-AI Investigation & Rehabilitation Pilot on Minor Gravity Sewer PipesSS766801
East Rocky Branch Improvements Phase 1SS733701
Leesburg Road InspectionsSS740902
Leesburg Road WideningSS740901
Louisa Street SS RelocationSS765901
Lower Crane Creek Storage Facility & Pump StationSS756001
Lower Kinley Creek Sewer ImprovementsSS756501
Mill Creek PS Miscellaneous ImprovementsSS749701
Miscellaneous Lift Station ImprovementsSS743701
MWWTP Dewatering Rolloff Receiving StationSS762301
MWWTP Electrical Supply Reliability ImprovementsSS764601
Olympia Sewer Relocation and RehabilitationSS753501
Relocate 4,345 Ft of 8-inch Sewerline - South Main Street - Blossom to PendletonSS751401
S Beltline Sewer RelocationSS765601
Saluda River Force Main Extension - GMP 1SS756801
SR02 and BR04 Engineer Led Find and Fix RehabilitationSS758301
Train 2 Aeration & Dewatering System UpgradesSS764501
Upper Kinley Creek Sewer ImprovementsSS733101
Upper Wildcat Creek Tributary SW & SS Infrastructure Eval/ImpSS760501
Vine Street Sewer ReplacementSS751701
WCPS ImprovementsSS756401
Woodlake Drive Sewer ReplacementSS751901

Upcoming Projects

No projects found for this status.