Project Description: This project proposes a 36-inch diameter extension of the existing Saluda River Force Main in order to relocate the force main outfall into the City’s gravity sewer system. The proposed force main will be revised to extend from its current outfall at Manhole 25109MH on the north side of the Saluda River to a new outfall location at 25213MH, located on the south side of the Saluda River. The force main will extend for approximately 3,500 linear feet; the exact length required shall be verified by the Consultant and coordinated with the City and CW2020. Total Current Contract Value is $446,350.00.

Public Benefit: Regulatory Compliance.

Project Map Project Gallery
  • Project Status
  • Project Schedule
  • Project Events
Submitted to procurement.
Estimated Design Start Spring 2021.

Estimated Design Completion Spring 2022.

Estimated Construction Start Summer 2022.

Estimated Construction Completion Summer 2023.