Project Description: This project involves rehabilitating the previously abandoned 36-inch pipe from manhole 26258MH near interstate 20 and Brickyard Road to manhole 24390MH at the Smith Branch interceptor. This section of pipe is approximately 7,860 linear feet of 36-inch concrete pipe and includes approximately 31 manholes. In conjunction with other 2020 Major Wastewater Collection and Transmission System (WCTS) Master Plan Updates, including the proposed addition of wet-weather storage tank(s) at the Old Eau Clarie Treatment Facility and relocation of the North Columbia Pump Station to the storage tank location, the restoration of this pipe will give the Crane Creek system the necessary conveyance capacity.
Public Benefit: Development Opportunity; Environmental; Regulatory Compliance.