Project Description: The effluent flow meter used during elevated river level events is not reliable and very difficult to maintain. This NPDES permit required meter has reached the end of its service life and will be replaced. Additionally, two influent flow meters on the two gravity trunklines discharging into Metro WWTP are needed for plant operations and use by Compliance and Industrial Pretreatment. These meters will track flows and loads from the respective collection basins and used in the collection system monitoring program to understand flow capacities of these basins relative to the program to control and reduce SSOs.

Public Benefit: Regulatory Compliance.

Project Map Project Gallery
  • Project Status
  • Project Schedule
  • Project Events
Council approved design 9/15/2020. Council approved construction 9/6/22.
Pending Project Close Out.