Project Description: The East Rocky Branch Sewer Improvements Phase 2 (Lower Phase) project consists of upsizing the existing piping for a distance of approximately 4,500 linear feet with new 36-inch diameter gravity sewer and for a distance of approximately 2,700 linear feet with new 42-inch diameter gravity sewer, all located along Rocky Branch. The project begins at the intersection of Main St and Whaley St and terminates at the connection to the existing 60-inch gravity line located near the Vulcan quarry along the Congaree River. This project was identified as part of the collection system hydraulic modeling study (Hazen and Sawyer, 2014).

Public Benefit: Development Opportunity; Environmental; Regulatory Compliance.

Project Map Project Gallery
  • Project Status
  • Project Schedule
  • Project Events
Council approved design 8/18/15. Council approved construction 7/21/20.
Pending Project Close Out.
Name Date Time Location Area
Columbia Water Quarterly Drop-In - Oct 2017 10/12/2017 6:00 - 7:30 Washington Square (City office on corner of Main & Washington)
FOOTER COMING SOON