The Major Sewer Pipe Rehabilitation CIPP Project consists of 24 separate “groups” located throughout each of the eight sub-basins within the City. The project consists of 73,159 linear feet of…
Read More
SCDOT Fairfield Rd Bridge Replacement Utility Relocation.
Read More
Miscellaneous improvements at the Mill Creek Pump Station including the replacement of the four existing drywell pumps with new PLC and VFDs, installation of an HVAC system for the entire…
Read More
Relocation of approximately 1,500 feet of 8,10, and 18-inch gravity sewer lines and appurtenances.
Read More
The intent of this project is to meet the requirements of the Continuing Sewer Assessment Program (CSAP) and the Infrastructure Rehabilitation Program (IRP) which are components of the Consent Decree…
Read More
The intent of this project is to meet the requirements of the Continuing Sewer Assessment Program (CSAP) and the Infrastructure Rehabilitation Program (IRP) which are components of the Consent Decree…
Read More
This project proposes the replacement of sanitary sewer piping to upsize the existing pipe from Manhole 01714MH to Manhole 01488MH for a distance of approximately 2,700 linear feet of 18-inch…
Read More
The aging sewer system, increased number of work orders, I&I, and SSOs have made this sewer basin a priority for rehabilitation. This basin was selected in accordance with our EPA…
Read More
This project consists of the investigation of Crockett Road, Atlas Road and Versch Lock Lift Stations, including all equipment and components, operating conditions, aesthetics, existing capacity and potential future capacity…
Read More
The peak sewer flows in the lower West Columbia outfall are primarily a function of the operations of the Saluda River Pump Station, which is upstream of the West Columbia…
Read More