This project provides program management services related to the City’s Clean Water Columbia Consent Decree Compliance and Infrastructure Improvements Program. This initiative provides a framework for supporting several areas, including…
Read More
Cost difference between constructing an 8-inch gravity sewer and an 18-inch gravity sewer to provide service to the Swygert Creek Sewer Basin.
Read More
This project consists of installation of approximately 1,100 feet of new 30-inch sewer force main and upsizing of approximately 2,200 feet of existing 42-inch gravity sewer to 48-inch. The project…
Read More
Small sanitary sewer CIP projects identified throughout the year that will typically be designed by City engineering staff. The projects generally consist of extensions and replacements throughout the system.
Read More
This project supports annual sewer contracts for various methods of rehabilitating pipelines less than 15 inches in diameter (8–12 inches). The rehabilitation contract incorporates alternative methods, including complete line replacement,…
Read More
This project will rehabilitate existing manholes that have been classified through Manhole Assessment and Certification Program (MACP) inspections as needing repair or having immediate rehabilitation needs. The City uses a…
Read More
The Colonial Life Force Main was identified as a high priority in a recent force main prioritization analysis. This project involved evaluating the force main alignment in consultation and coordination…
Read More
The Metro Wastewater Treatment Plant Train II DAF Improvements Consent Decree Early Action Project (EAP) replaced worn process equipment and assessed other components for wear and future replacement needs. The…
Read More
The Metro Wastewater Treatment Plant Aeration Consent Decree Early Action Project (EAP) provided upgrades to four aeration treatment basins and critical operating processes increasing efficiency and reliability and reducing costs.
Read More
Clean each digester, replace heat exchangers, rotary gas valves, pearth gas, waste gas burners, valves, piping, pumps, and appurtenances indentified in a recent asset assessment study. Total Current Contract Value…
Read More