The City of Columbia owns and operates 56 pump stations in its wastewater collection and transmission system, including six major stations. Under the Clean Water 2020 Program, the City is…
Read More
This project includes sewer relocations associated with the widening of Leesburg Road from near Fairmont Road to near Lower Richland Boulevard, a distance of approximately 3.9 miles.
Read More
SCDOT proposes to widen Leesburg Road from 719 feet west of S-88 (Fairmont Road) to 705 feet east of S-37 (Lower Richland Boulevard), a distance of approximately 3.9 miles. The…
Read More
This project initially involved designing the rehabilitation of the previously abandoned 36-inch pipe (approximately 7,860 linear feet) from manhole 26258MH near Interstate 20 and Brickyard Road to manhole 24390MH. This…
Read More
This project consists of the installation of a new 48-inch diameter gravity relief sewer in the Lower Gills Creek system for a distance of 6,500 linear feet. The new pipe…
Read More
The purpose of this project is to assist the City of Columbia by providing final design and construction services identified under the previous SS7454 project scope and documented in a…
Read More
The project proposes a permanent dewatering roll-off receiving station at the Metro WWTP. The Metro WWTP is currently using a temporary location and configuration to receive City sewer-maintenance vacuum trucks,…
Read More
This project proposes a permanent storage and feed system for magnesium hydroxide slurry for treatment Train 2 at the Metro WWTP. Currently, Train 2 has a temporary magnesium hydroxide chemical…