A Program Of The

City Of Columbia

Project Description: Relocation of Existing 8" Sewer Main constructing 410' of New 8" Sewer Main with five (5) New Manholes, and 190' of New 24" RCP Storm Drainage Pipe with two (2) New Catch Basins.

Public Benefit: N/A

Project Map Project Gallery
  • Project Status
  • Project Schedule
  • Project Events
Approved at Council 1/18/2022.
To be determined.
Name Date Time Location Area
FOOTER COMING SOON