Project Description: The existing 15”, 24”, and 30” trunklines in the Broad River basin are undersized for the projected peak flows, resulting in the sewer surcharging above acceptable levels. The level of flow in the pipes exceeds the limit established as part of the CAP requirements. If this project is not completed, the projects identified as CIP13 and CIP 14 (Upper and Lower Broad River Sewer Improvements) will need to be scheduled sooner (into the 2020 time-period list of projects) to prevent continued surcharge. Total Current Contract Value is $96,044.54.

  • Council District: I & Outside
  • Sewer Basin: Broad River

Public Benefit: Environmental; Regulatory Compliance

Project Map Project Gallery
Gallery Not Available
  • Project Status
  • Project Schedule
  • Project Events
Prioritization of project underway.
Funding Source Only.
Name Date Time Location Area